HILTON GARDEN INN – Birmingham Airport (Flagship Project)

Project Requirements

This project is at the height of innovation in which the bedrooms were prefabricated cabins that were fitted in China before being shipped to the UK. One of the mains reasons for this is to reduce on site time; which in its self reduces costs, labour, hire and equipment.

The hotel boosts 200 bedrooms and with a programme reduced to a third of the usual time for a project of this size; Clear Climate had to work extremely hard and pull out all of the stops to ensure the project was completed on time to the high standards which are expected with a quality brand such as Hilton.

Project Summary

The project was very fast paced with many trades working within the same areas and completing lots of areas at the same time. Clear Climate had to keep up with this pace and ensure all services were completed on time to ensure building works were on time.
The chosen manufacturer of equipment was Toshiba which was an excellent choice for this solution, along with the 200 bedrooms there were an additional 18 units on the Ground Floor for staff and customer areas. Due to the size of the hotel and long piping runs, a Leak Detection system was introduced to allow this solution to comply with EN378. This was a fantastic project to be involved with and we are very proud to of been a part of such a new innovation of working.