AMAZON OFFICE – YORK
Close Control / Modification

Project Requirements

Our remit on this project was to Supply, Install and Commission several Close Control Systems for the specialist Comms area. The consultant on this project chose this type of system as this area generates a high sensible cooling load.

The Airedale Close Control units we supplied are capable of very high loads from a small internal unit size which maximised the space the client had for comms equipment.

As part of the new works, Amazon were also refurbishing existing areas and modifying office spaces to suit new layouts. This meant we had to modify the existing VRF systems install to suit the new internal requirements along with adding multiple new Indoor units. Due to the age of the existing system, we had to install a new controls system to allow the systems to communicate in the way the client desired.

Project Summary

This project was an excellent test for Clear Climate and gave us the opportunity to show that we are capable of providing a solution to any problem. We had to overcome very tight time constraints and meet specific delivery dates for crane lifts. It was a fantastic opportunity to work for such a huge brand and we took huge pride in providing a solution to the high standards Amazon expect.